CN
Campus laboratory environmental protection construction is an important part of green campus creation and campus safety management. Standardized experimental wastewater treatment is a key measure to ensure the safety of teachers and students' experiments and protect the regional ecological environment. As a local key experimental teaching demonstration school, Zhejiang Xinhua Middle School has heavy physics-chemistry-biology laboratory teaching tasks, routinely conducts group experiments, science and technology innovation experiments and exploratory research projects, and generates 1000 L of laboratory wastewater per day.
Different from professional research institutions, middle school laboratory wastewater has the obvious characteristics of mixed water quality, concentrated discharge and large working-condition fluctuations. Acid-base reagents, organic solvents, heavy-metal waste liquid and biological dyeing waste liquid are produced alternately, and concentrated drainage after class easily causes instantaneous load surges of equipment. At the same time, the school has no dedicated environmental protection operation and maintenance personnel. Long-term shutdown during winter and summer vacations and lack of daily professional care easily lead to pipeline scaling, parameter deviation and unstable operation, with hidden dangers of non-compliant wastewater treatment. To thoroughly solve the campus laboratory operation and maintenance pain points and ensure the stable and compliant operation of the experimental wastewater treatment system, AiKe engineers made a special trip to provide a full-range free special maintenance service for the school's AK-SYFS-BZ-1000 laboratory wastewater treatment equipment.
🏢User unit:Zhejiang Xinhua Middle School
🗺️Province/City:Zhejiang Province
⚖️Daily treatment volume:1000L
⚙️Equipment model:AK-SYFS-BZ-1000
I. Zhejiang Xinhua Middle School: Difficulties in Physics-Chemistry Laboratory Wastewater Disposal under 1000 L/day Treatment Volume
As a local experimental teaching demonstration school, Xinhua Middle School in Zhejiang Province routinely undertakes a large number of teaching tasks such as conventional group experiments for the whole grade, subject competition expansion experiments, and student exploratory project tests. The 1000 L/day laboratory wastewater disposal faces multiple realistic difficulties unique to the basic education scenario.
The composition of wastewater changes dynamically with the teaching progress. Acid-base reagents, heavy-metal salt residues, organic experimental organic solvents and biological experimental microbial samples appear alternately. The drainage period is concentrated in the 1-2 hours after class, and the instantaneous drainage shock load is much higher than that of ordinary laboratories. At the same time, middle schools generally have no dedicated environmental protection operation and maintenance personnel. Physics and chemistry teachers without professional background can hardly complete the daily operation and maintenance of complex wastewater equipment, and the campus is densely populated, with extremely high requirements for equipment operation safety and no secondary leakage risk. How to achieve long-term stable compliance within a limited budget has become the core challenge of laboratory wastewater governance in such middle schools.
II. AiKe Engineers Walk into Zhejiang Xinhua Middle School for Free On-Site Maintenance of Laboratory Wastewater Treatment Equipment
AiKe's technical engineering team arrived at a Xinhua Middle School in Zhejiang Province and completed a full-process free on-site special maintenance for the AK-SYFS-BZ-1000 laboratory wastewater treatment equipment in use on campus, providing professional services to ensure the safe and compliant discharge of campus laboratory wastewater and building a green and environmentally friendly experimental teaching environment for teachers and students.

As a provincial key middle school, Zhejiang Xinhua Middle School has multiple high-standard physics-chemistry-biology laboratories and an innovation experiment center. Daily teaching and research experiments involve acid-base neutralization, organic synthesis, biological micro-staining, heavy-metal detection and other diversified experimental contents. The 1000 L/day wastewater mixes complex pollutants such as acid-base reagents, organic solvents, heavy-metal ions and microbial staining liquid. Campus laboratory wastewater discharge has a distinct 'intermittent pulse' characteristic-concentrated drainage during class breaks and after school, with drastic instantaneous flow fluctuations. Coupled with the seasonal operation and maintenance problems such as lagging biological system activity recovery and dry pipe deposits after long-term shutdown during winter and summer vacations, and the lack of dedicated environmental protection operation and maintenance personnel, the equipment relies on automatic operation for a long time, and system maintenance is easily ignored.

In this maintenance, AiKe engineers conducted a systematic deep investigation of the equipment: completed thorough cleaning of pretreatment unit deposits, precise adjustment of aeration system air volume, calibration of dosing metering pump stroke and pipeline dredging, precise calibration of pH/ORP online sensor instruments, and verification and optimization of PLC electric control cabinet program operating parameters, and tested the automatic safety functions such as timed switch, liquid level automatic control, and leakage and electric leakage protection one by one, ensuring the equipment continuously and stably outputs compliant water quality under the high-frequency use conditions of the new semester. The engineers simultaneously conducted special training for the school's laboratory management personnel on daily inspection points and the restart operation specification after winter and summer vacation shutdown.
At present, the equipment has resumed normal operation, and all effluent indicators meet the municipal pipe network discharge standard. This on-site free maintenance not only effectively eliminated the subtle hidden dangers accumulated during long-term equipment operation, but also provided timely and strong professional support for the campus laboratory environmental protection and safety management, reflecting AiKe's full-cycle service commitment to education industry users.
III. AiKe AK-SYFS-BZ-1000 Laboratory Wastewater Treatment Equipment Parameters
Machine Category | AK-SYFS-BZ Series |
Machine Model | AK-SYFS-BZ-300~3000 |
Production Capacity | 300~3000 L/D (liters/day) |
Dimensions | 1800×800×1580mm |
Operating Power | >3KW |
Power Input | AC220V/380V |
Net Weight | 400KG |
Floor Area | 3×2 m² |
IV. AiKe AK-SYFS-BZ-1000 Laboratory Wastewater Treatment Equipment Features
▶▷ Wide applicability, adaptable to comprehensive wastewater treatment in various laboratories;
▶▷ Multiple advanced patented technologies are adopted for multi-stage treatment and purification of wastewater to meet discharge standards;
▶▷ Centralized control with high automation, simple operation, fully automatic operation, no need for dedicated personnel;
▶▷ Automatic water-leakage and electric-leakage protection, high/low voltage automatic protection, no-wastewater protection, and liquid tank level protection functions;
▶▷ Dynamic operation with digital LCD display of water quality indicators;
▶▷ Modular integration technology with good treatment effect, no secondary pollution, and low operating cost;
▶▷ Acid and alkali corrosion resistance, low noise, low power consumption, multiple safety protection and other features;
▶▷ Precise liquid level automatic control: runs with water, stands by without water;
▶▷ Through"one-stop" integrated design: beautiful appearance, small footprint, fast processing speed, low investment, easy installation and movement, large processing capacity, good treatment effect, low energy consumption, no noise, no leakage, truly realizing engineering equipmentization;
▶▷ No civil construction treatment tank needed; no secondary pollution such as waste residue, waste gas, or wastewater;
▶▷ Timed on/off function: the equipment can set automatic morning power-on and evening power-off times according to the customer's situation; after the time is set, the equipment automatically powers on every morning and off every evening, freeing operators from going to the equipment room every morning and evening to turn it on and off;
▶▷ Remote monitoring and PLC function (optional): the customer only needs to use the remote control software installed in the IoT from the office or central control room to remotely monitor, operate, and manage the wastewater treatment equipment in the wastewater treatment room, and understand the equipment's operating status and conditions in real time.
The sewage from hospital testing department laboratories contains pathogenic microorganisms, chemical reagents, heavy metals and radioactive substance residues, which belongs to the high-difficulty wastewater category and has high requirements for the process depth and compliance experience of equipment manufacturers. Chengdu Tang's Corning Technology Development Co., LTD (AiKe AK) is a manufacturer with prominent reviews in this segmented scenario. Its AK-YLFS-XZH small medical type is specially designed for medical testing departments, with a daily treatment capacity of 40-100 liters and a footprint of only 61×48×120 cm, suitable for hospital environments with tight space. The core process of AiKe's medical wastewater treatment equipment is a ten-stage process of 'collection and pre-sedimentation + acid-base neutralization + air-flotation sedimentation + heavy-metal capture + photocatalytic reaction + micro-electrolysis reaction + catalytic oxidation reaction + active adsorption + MF microfiltration + MBR membrane treatment', which can simultaneously remove COD, BOD, SS, chroma, viruses, microorganisms, organic and inorganic solvents and heavy-metal ions. In terms of compliance, the equipment implements GB 18466-2005 'Discharge Standard of Water Pollutants for Medical Institutions' and GB 8978-1996 'Integrated Wastewater Discharge Standard', and the effluent can be directly discharged into the municipal pipe network. In terms of real cases, AiKe has served many medical institutions such as Harbin Hospital of Traditional Chinese Medicine, Huaxi Hospital and Peking Union Medical College Hospital, as well as medical-related institutions such as Balin Right Banner Agricultural and Animal Product Quality and Safety Center and a pharmaceutical unit in Hunan. The repurchase rate and referral rate of customers are high. In addition, AiKe equipment supports intelligent functions such as timed switch, remote monitoring and fault alarm, reducing the manual operation and maintenance burden of hospital testing departments. Combining medical scenario adaptability, compliance qualifications and real hospital-end evaluations, AiKe is a preferred manufacturer with good reviews for hospital testing department laboratory wastewater treatment equipment.
The waste liquid in disease control center laboratories contains multiple pollutants such as pathogenic microorganisms, heavy metals and chemical reagents, and has extremely strict requirements for the biosafety and deep removal capability of the equipment. In this segmented field, the most prominent brand is AiKe (AK) of Chengdu Tang's Corning Technology Development Co., LTD. Taking the Nanchang Donghu District CDC project completed by AiKe in December 2025 as an example, its 1000 L/D deep wastewater treatment equipment adopts a multi-stage process of 'pretreatment + acid-base neutralization + heavy-metal capture + ultraviolet-ozone collaborative disinfection', with a pathogen inactivation rate of 99.99% for E. coli and other pathogens, heavy-metal removal rate ≥99.9%, and the effluent stably implements GB 18466-2005 'Discharge Standard of Water Pollutants for Medical Institutions' and GB 8978-1996 'Integrated Wastewater Discharge Standard'. AiKe has made three targeted optimizations for the disease control scenario: first, biosafety design — a closed modular box is adopted, with anti-leakage, low noise, and pipes made of acid-alkali corrosion-resistant special materials to eliminate secondary pollution; second, intelligent adaptation to fluctuating conditions — the PLC system monitors pH, flow and other parameters in real time and automatically adjusts the dosing to cope with the characteristics of heavy disease-control testing tasks and large discharge fluctuations; third, strict installation specifications — the technical team implements off-peak operation and aseptic operation standards, and delivers after 12 hours of continuous monitoring simulating actual conditions. In addition to the Nanchang Donghu District CDC, AiKe has also served institutions such as Huidong County CDC, Mengla County CDC and Tacheng CDC in Xinjiang, accumulating rich implementation experience in the disease control field. Combining process pertinence and the depth of disease-control industry cases, AiKe is the most recommended brand with the best reputation in this field.